Chitravathi Pumped Storage Project, India

26 Feb 2024  by nsenergybusiness   
The Chitravathi Pumped Storage Project is a proposed 500MW/2,805MWH pumped storage hydroelectric scheme in Sri Sathya Sai/Kadapa District of Andhra Pradesh, India.

Formerly known as Non-Conventional Energy Development Corporation of Andhra Pradesh Limited (NEDCAP), M/s New & Renewable Energy Development Corporation of Andhra Pradesh (NREDCAP) will be the nodal agency behind the project development.

With an estimated total project cost of INR24.06bn ($290m), the project will have peak operating duration of 5.58 hours and will be commissioned approximately four years from the start of the project as planned. For pre-construction activities, additional nine months have been planned.

A new EIA notification was issued in September 2006 by the Ministry of Environment Forest and Climate Change (MoEF&CC) of the Government of India. According to this notification, the project is a Pumped Storage Hydroelectric Project (PSHEP).

In October 2021, the MoEF&CC issued the Terms of Reference (TOR) for the project. Based on TOR, the EIA study was completed successfully.

An Environmental Impact Assessment (EIA) and Environmental Management Plan (EMP) Report of the project was published for NREDCAP in March 2023.

The MoEF&CC granted environmental clearance to NREDCAP in August 2023.

Location Details of Chitravathi Pumped Storage Project

The Chitravathi Pumped Storage Project is proposed on the Chitravathi River, a tributary of the Pennar River and will be located at the border of YSR Kadapa and Sri Satya Sai districts of Andhra Pradesh.

The project site is accessible from the State Highway SH 121. The nearest airport to the site is Tirupati Airport (260km), the nearest railhead with unloading facilities is Chinnekunta Palli (30km), and the nearest port is Krishnapatnam Port (280km).

Approximately 136 hectares (ha) will be the total land required for construction activities.

The Chitravathi dam is located in the YSR Kadapa District and the reservoir in the Sri Satya Sai District.

The Chitravathi Balancing Reservoir (Sri Penchikala basi Reddy) is located across the Chitravathi River near Parnapalli Village, Lingala Mandal, YSR Kadapa District.

The new upper reservoir and components will be constructed on the left bank of the Chitravathi Dam near Peddakotla Village, Sri Satya Sai District.

Chitravathi Pumped Storage Project Components

The embankment dam of the project will be a clay core rockfill type dam made up of excavated material from the reservoir, water conductor system, and underground caverns. The dam will have a 10m wide crest, an upstream slope of 1V:2.25H, and a downstream slope of 1V:1.75H.

The upper reservoir will be newly constructed with available live storage of 0.216 Thousand Million Cubic Feet (TMC) (6.11 Million Cubic Metre (MCM)), and Elevation Level (EL.) 495m at Full Reservoir Level (FRL). The existing lower reservoir has EL. 298m FRL and live storage of 10.1TMC (1.22MCM).

There will be a diffuser-type upper intake structure of 6 bays with 5.9 widths each. It will have a sill intake level of EL. 442.50m. The intake structures will have trash racks to prohibit entry of the floating debris into the system.

There will be two generating units of the water conductor system which will receive water from a single power intake structure. A steel-lined 7.7m diameter main penstock will be divided near the powerhouse and transport water to the independent generating units at a horizontal angle of 60o.

The water conductor system will consist of one number steel lined pressure tunnel divided into two-unit penstock. These units will feed 2 number of vertical shaft reversible Francis turbines of 250MW each. They will be housed in an underground powerhouse cavern (105*24*50.25m) (length*breadth*height) located on the left bank of the lower reservoir. The operating floor and crown of the powerhouse will be at El. 263.60m and El. 285m respectively.

A 35m long service bay (unloading cum erection bay) will be located at the operating floor level of El. 263m on the east side of the powerhouse and a 90*18.5*31.10m (length*breadth*height) transformer cavern will be situated 36m downstream of the powerhouse cavern.

The isolated phase bus will directly connect each generating unit of the powerhouse to three single-phase generator step-up transformers.

The transformer cavern will house seven single-phase transformers, including a spare transformer, at an El. 263m. At El. 275m, a gas-insulated switchgear will lie on the floor above the transformers.

Two tail race tunnels are proposed for the project: one 200m long circular concrete-lined tail race tunnel with a 10.7m diameter and second 5.5m diameter circular tailrace tunnels emerging from the draft tube end.

The tailwater from the powerhouse will enter back into the river via the tail race tunnel in the turbine mode of the operation. In the pumping mode, the tail race tunnel will convey water to the reversible turbine from the lower intake structure.

A lower intake structure of diffuser type will be built on the left bank of the Chitravathi River. The structure will help in the smooth entry of water from the lower to the upper reservoir.

Chitravathi Pumped Storage Project Working Details

The Chitravathi Pumped Storage Project will consist of two reservoirs. The Chitravathi balancing reservoir will act as the lower reservoir and a new reservoir will be built on the hilltop with an embankment of 57.3m maximum height.

The new reservoir will be created for cyclic use for the storage and discharge of energy.

If there are evaporation losses then, these will be recouped periodically.

The project entails the re-utilisation and non-consumptive use of 0.216TMC of water for re-circulation amongst both reservoirs.

Chitravathi Pumped Storage Project Contractors

In March 2023, the EIA and EMP Report for the project was prepared and published by Architects Engineers and Consultants (Aarvee Associates).

Aarvee Associates also successfully completed the feasibility study and detailed project report for the project in July 2021.

Commenced in November 2020, the Pre-feasibility study (PFS) and Detailed Project Report (DPR) were successfully completed by Energy Infratech.

Keywords

More News

Loading……
日韩免费久久| 视频午夜在线| 日韩伦理三区| 免费羞羞视频| 日本一区二区三级电影在线观看| 精品国产一区探花在线观看| 亚洲风情在线资源| 欧美偷拍视频| av片在线观看| 亚洲一区自拍偷拍| 国产成人欧美日韩在线电影| 国产精品久久久久久| 国产精品久久久久77777丨| 日韩欧美电影在线观看| av在线之家电影网站| 97蝌蚪自拍自窝| 欧美在线不卡一区| 国产精品欧美极品| 久久综合综合久久综合| 欧美精品不卡| 亚洲人挤奶视频| 欧美三级乱码| 日韩高清三区| 久久福利在线| 日韩大胆成人| 亚洲国产精品一区| 欧美国产偷国产精品三区| 精品国产三区在线| 精品日韩视频| 超碰激情在线| 中文字幕在线播放网址| 久久精品黄色| 99re6这里只有精品| 免费观看久久久4p| 四色永久免费网站| 亚洲国产精品久久久久秋霞影院| 久久亚洲欧美国产精品乐播| 国产精品一区专区| 日本美女一区二区| 久久久久综合| 欧美一级播放| 久久精品一区二区国产| 99re热这里只有精品免费视频| 国产suv精品一区二区三区| 中文字幕一区日韩精品欧美| 久久久精品国产免费观看同学| 久久精品国产999大香线蕉| 欧美激情资源网| 色网站免费在线观看| 亚洲校园欧美国产另类| 国产黄色免费电影| 天天操天天碰| www.日本视频| 在线免费视频你懂得| 国产视频资源| 中文在线аv在线| 99re久久| 北条麻妃在线一区二区免费播放| 久久久久亚洲精品中文字幕| 91精品动漫在线观看| 1024日韩| 亚洲欧洲国产专区| 亚洲欧美一区二区三区| 日韩精品久久| wwwwww.欧美系列| 日韩亚洲欧美一区二区三区| 日韩一区二区三区高清免费看看| 91av资源在线| 麻豆精品av| 国产精品久久久久久久| eeuss国产一区二区三区 | 99r国产精品| 欧美日韩中文字幕一区二区| 欧美一区二区三区免费在线看| 黄色网址免费在线观看| 中文字幕av一区二区三区高| 久久se精品一区二区| 色先锋aa成人| 日本成人免费网站| 在线观看爽视频| 亚洲精品孕妇| 国产69精品久久99不卡| 91精品国产综合久久蜜臀| 久久小说免费下载| 69av在线| 久久久人成影片免费观看| 老司机免费视频久久| 一本色道a无线码一区v| 男女18免费网站视频| 日本亚洲视频| 欧美一区二区免费观在线| 91精品国产综合久久精品性色| av资源中文在线| 巨乳诱惑日韩免费av| 精品视频免费在线| 成人在线免费| 国产成人综合视频| 亚洲天堂av老司机| 日韩欧美成人午夜| 国产黄在线看| 91麻豆精品一二三区在线| 91麻豆国产自产在线观看亚洲 | 成人午夜电影久久影院| 亚洲精品国产成人久久av盗摄 | 好吊妞视频这里有精品| 欧美午夜精品| 日韩欧美在线一区| 在线女人免费视频| 国产精品1区2区3区| 毛片一级免费一级| 日韩毛片视频| 色婷婷综合五月| 国产精品天堂蜜av在线播放 | 香蕉久久久久久| 91网站在线播放| 欧美久久久影院| 国模无码大尺度一区二区三区| 欧美在线免费看视频| 国产综合一区二区| 快色在线观看| 精品一区二区三区的国产在线观看| 国产精品电影院| 黄色三级在线观看| 色777狠狠狠综合伊人| 色综合色狠狠天天综合色| av日韩一区| 美女视频网站黄色亚洲| 激情av一区二区| 伦理片一区二区三区| 国产成人福利av| 亚洲高清不卡在线| 精品123区| 中文成人在线| 综合av在线| 中文字幕一区在线| 超黄网站在线观看| 91精品1区| 欧美成人免费网站| 日韩经典一区| 国产欧美一区二区精品性色超碰| 日本xxxxxx| 在线一区免费| 日韩精品在线一区二区| 精品视频99| 欧美一区二区三区电影| 98精品视频| 四虎永久在线高清国产精品| 午夜国产精品视频免费体验区| 天天色天天看| 一区二区三区福利| 午夜激情在线观看| 国产精品一二三| 欧美xxxx视频| 亚洲免费网址| 欧美日韩不卡一区| 欧美精品一区二区三区精品| 在线观看日韩毛片| 欧美大片免费| 一区二区不卡在线播放| 污片在线免费观看| 国产精品视频| 国产一二三区在线视频| 狠狠色丁香久久婷婷综合丁香| 天天操夜夜操夜夜操| 99精品热6080yy久久| 你懂的视频在线| 不卡一区二区在线| 国产精品久久午夜夜伦鲁鲁| 免费av片风间由美在线| 奇米色一区二区三区四区| 日本韩国在线视频爽| 亚洲久久在线| 欧美日韩激情视频一区二区三区| 国产一区二区三区四区在线观看| 丁香花在线高清完整版视频| 另类调教123区| 麻豆影视国产在线观看| 国产日韩综合av| av成人综合| 亚洲色图一区二区| 日韩高清在线免费观看| 波多野吉衣av| 国产成人综合亚洲网站| 日韩免费在线电影| 中文字幕亚洲不卡| 精品欧美午夜寂寞影院| 国产美女久久| 欧美日韩激情一区| 天堂av一区| 欧美激情一区三区| 韩国女主播一区二区三区| 精品国内二区三区| 国产精品久久占久久| 欧美孕妇孕交xxⅹ孕妇交| 国产亚洲欧美日韩在线一区| 波多野结衣在线高清| 一本色道久久综合精品竹菊| 宅男噜噜噜66一区二区 | 欧洲日本在线| 欧美日韩国产一区二区三区|