Lessons From Excavating the 250MW Kidston Pumped Storage Project

27 Jan 2025  by waterpowermagazine   


Aerial view of the project in February 2024

The 250MW Kidston pumped storage project is currently under construction and will be the first pumped hydro project in Australia for over 40 years. It will also be the first to be developed by the private sector and the third largest electricity storage device in the country. Forming part of the Kidston Clean Energy Hub in North Queensland, it also comprises a solar and wind power project.

Genex Power, the company which owns the project, recently discussed the lessons it has learnt with respect to the excavation of the project’s shafts.

Four shafts are required to be excavated:

Ventilation Shaft – 4.1m diameter (excavated), 243m deep

Cable Shaft – 4.1m diameter (excavated); 252m deep

Intake Shafts x 2 – 5m diameter (excavated); 244m deep

Raisebore techniques were used to sink the shafts, with the shafts excavated from the bottom up. This was made possible due to the availability of underground caverns prior to excavation commencing. The general methodology followed was:

Establishment and survey

Installation of pilot hole

Attachment of cutterhead and ream the shaft towards the surface

Removal of cutterhead and dis-establishment.

Genex discussed various key challenges and lessons learned relating to the raisebore operations and focused on ground conditions, the pilot hole, and reamer operations and removal.

Ground conditions

During raisebore operations, the excavated shaft is an unsupported circular profile, and support can only be given once the reaming operations are complete. Raisebore shaft construction techniques are normally adopted where ground conditions are favourable, access is provided to the shaft bottom, and the project shaft diameter and length are deemed as being suitable for the equipment available. Where the ground conditions are less stable and at risk of collapse/ravelling, then structural ground support treatment is required.

Following a comprehensive geotechnical investigation, Genex identified that all four shafts would encounter competent rock, with the exception of the top 20m of ground for the ventilation and cable shaft locations where extremely weathered rock was found. This could result in potential ground squeeze, ravelling and stability issues if left unsupported.

As such, the project commenced the installation of a secant piled ring in the upper zone of both the ventilation and cable shafts as an advanced pre-sink activity to the raisebore operations. This activity was not included as part of the original scope of works as the geotechnical information needed to be confirmed. Further geotechnical information obtained during detailed design confirmed the need for pre-sink piles.

Genex says the lesson learnt here highlights the importance of good geotechnical investigation and analysis to make informed decisions on ground treatments and supports. This was a known risk at the Kidston Project and was confirmed and addressed prior to raisebore operations commencing.

Pilot hole

The pilot hole links the top and bottom of the shaft and ultimately sets the shaft alignment. Ensuring verticality when drilling the pilot hole is of utmost importance. At Kidston, the pilot hole for each shaft was drilled using the rotary vertical drilling system.

The pilot hole within the cable shaft encountered a rogue geotechnical monitoring instrument at depth, which twisted around the drill head and affected the verticality of the hole, and in turn the shaft. This was remedied by removing the pilot hole drill rods, clearing the drill bit, and recommencing pilot hole drilling.

The lesson learnt relates to ensuring that the utilisation of state-of-the-art positioning and drilling equipment will provide the greatest chance of shaft verticality. Genex says that other methods are available but for the Kidston Project, verticality was paramount and would not have been achieved without the use of the rotary vertical drilling system.

Reaming operations and removal

Once the cutter head is in action it is critical to ensure that for safe operation the cuttings are free to fall the to the base of the shaft and removed frequently to make sure they don’t block the shaft opening. In previous projects shafts have choked and resulted in the uncontrolled movement of cuttings into the bottom of the shaft, filling the underground works with such force that equipment has been known to be transported up the tunnel drive.

The report highlights that good communication between underground and raise bore teams is critical during reaming operations. The appropriate methodology and safety provisions are also required to facilitate removal of the reamer head at the surface. This minimises time and cost as opposed to attempting to lower the reamer head to an underground chamber because, at a depth of 250m depth, the reattachment of drilling strings to lower and then the subsequent removal of these is time-consuming.

 

Kidston pumped storage: key facts

The 250MW Kidston Pumped Storage Hydro Project (K2-Hydro) is a landmark renewable energy project and the centerpiece of the Kidston Clean Energy Hub in Far-North Queensland, Australia. This project is a critical component in Australia’s shift towards renewable energy, designed to generate, store, and dispatch power during peak demand periods.

Key Features

Nameplate Capacity: 250MW

Storage Capacity: 2,000MWh (8 hours of continuous generation)

Start-Up Time: Less than 30 seconds

Lifespan: 80 years

Water Head: 218m (max) – 181m (min)

Turbines: 2 reversible turbines (125MW each)

Upper Reservoir: Wises Pit (52 hectares)

Lower Reservoir: Eldridge Pit (54 hectares)

The Kidston Pumped Hydro Project is the world’s first to repurpose an abandoned gold mine, utilizing Wises and Eldridge pits as its upper and lower reservoirs. This innovative approach reduces capital expenditure by reusing existing mining infrastructure, such as an accommodation camp, airstrip, and water supply systems, resulting in faster construction and lower costs. The Copperfield Dam provides a stable water source for the hydro system via an existing pipeline, further minimizing additional infrastructure needs.

The project is also integrated into the larger Kidston Clean Energy Hub, which combines large-scale solar, wind energy, and pumped storage hydro. This integration allows for efficient energy generation, storage, and dispatch, providing reliable renewable energy on demand, especially during peak periods. A dedicated transmission line will connect the hub to the National Electricity Market (NEM), enhancing the stability of North Queensland’s grid and providing much-needed system strength.

Financially, the project reached contractual close in April 2021, with construction starting in May 2021. The total construction cost is approximately A$777 million, backed by a robust funding package. A 15-year, A$610 million debt facility was secured from the Northern Australia Infrastructure Facility, alongside a A$47 million grant from the Australian Renewable Energy Agency (ARENA), and an additional A$3 million of subordinated debt from the Clean Energy Finance Corporation. The project is set for completion by 2025.

The economic benefits of the project are considerable, with 900 direct jobs created during the construction phase. Additionally, the project will help Queensland meet its Renewable Energy Targets of 70% by 2032 and 80% by 2035, playing a vital role in Australia’s clean energy future. By combining innovation, integration, and economic value, K2-Hydro is a model for future renewable energy developments.

The project is being delivered by leading contractors McConnell Dowell and John Holland, with Entura providing engineering consultancy.

More News

Loading……
色综合天天综合色综合av| 久久在线免费| 国产精品成人3p一区二区三区| 免费看男女www网站入口在线| 伊人春色在线观看| 天天综合av| **日韩最新| 午夜a一级毛片亚洲欧洲| sdde在线播放一区二区| 欧美激情第二页| 日本亚洲欧美天堂免费| 国产精品中文欧美| 久久精品视频在线免费观看| 中文一区在线播放| 色婷婷av一区二区三区gif | 91国内精品| 国产不卡一区| 亚洲伦理一区| 国产69精品久久久久毛片| 国产日韩精品久久久| 亚洲一区视频在线观看视频| 色婷婷久久久综合中文字幕| 色aⅴ色av色av偷拍| 国产视频福利在线| 中文字幕在线中文字幕在线中三区| 成人精品在线| 欧美日韩精品一区二区视频| 国产日韩欧美高清免费| 精品在线一区二区| 亚洲人妖av一区二区| 欧美日韩成人在线一区| a4yy在线播放免费观看视频| 国产写真视频在线观看| 在线成人视屏| 精品视频亚洲| 久久se精品一区精品二区| 国产午夜精品福利| 欧美三级电影一区| 欧美精品少妇| 国产亚洲精彩久久| 欧美91精品| 国产成人av电影在线观看| 亚洲一区二区在线视频| 精品美女在线观看| 国产婷婷视频在线| 亚洲第一福利专区| 蜜臂av日日欢夜夜爽一区| 最新中文字幕一区二区三区 | 国产91亚洲精品久久久| 99久久99久久精品国产片果冰| 精品一区二区免费在线观看| 国产精品高清亚洲| 日本a级片免费| av免费不卡| 欧美一区2区| 国产精品白丝jk白祙喷水网站 | bl在线肉h视频大尺度| 色综合综合色| 成人国产精品免费观看动漫| 欧美最新大片在线看| 成人性生交大片免费看午夜| 综合成人在线| 狠狠色丁香婷婷综合久久片| 亚洲成a人片综合在线| 无限国产资源| 美女日韩一区| 国产麻豆日韩欧美久久| 日韩欧美国产成人| 老司机福利在线视频| 国产欧美一区二区三区精品观看| 成人激情校园春色| 精品国产伦理网| 欧美福利在线播放| 性伦欧美刺激片在线观看| 亚洲国产精品久久一线不卡| 免费在线黄色电影| 精品少妇av| 亚洲色图欧美偷拍| 狠狠色伊人亚洲综合网站l| 少妇高潮一区二区三区| 成+人+亚洲+综合天堂| 成人午夜剧场免费观看完整版| 日韩电影网站| 久久精品国产精品青草| 欧美一区二区视频在线观看2020| 人在线成免费视频| 日韩高清不卡一区二区| 欧美日韩免费高清一区色橹橹| 黄毛片在线观看| 日韩激情视频在线观看| 欧美色综合网站| 精品众筹模特私拍视频| 日日夜夜精品免费视频| 欧美日韩久久久一区| 免费电影日韩网站| 极品美女销魂一区二区三区| 天天操天天擦| 欧美男人操女人视频| 国产精品视频一二三区| 在线日本视频| 欧美三区不卡| 欧美欧美欧美欧美| www.久久草.com| 91麻豆高清视频| 国产女主播在线写真| 激情五月***国产精品| 欧美性感一类影片在线播放| 成人日韩精品| 99久久久免费精品国产一区二区| 96久久久久久| 66视频精品| 欧美日本一区二区三区四区| 欧美三级精品| 国产丝袜欧美中文另类| 色网站在线看| 免费在线欧美视频| 日韩男人天堂| 亚洲欧美文学| 欧美成人综合网站| 国模精品一区| 色综合久久天天| 亚州欧美在线| 亚洲丝袜精品丝袜在线| 蜜桃av在线| 国产不卡在线一区| 国产露出视频在线观看| 久久久亚洲一区| 一级黄色av| 亚洲精品黄色| 狠狠干五月天| 好看的av在线不卡观看| 欧美大片免费久久精品三p| 欧美理论视频| 欧美精品精品一区| 国产亚洲一区| 欧美日韩激情一区二区| 婷婷国产精品| 欧美日韩成人激情| 欧美日韩播放| 日韩视频一区二区三区| 国产精品99一区二区三区| 91麻豆精品国产| 青青草国产成人a∨下载安卓| 911精品产国品一二三产区| 久久99精品久久久久久园产越南| 欧美伊人久久久久久久久影院| 欧洲在线一区| 欧美一级生活片| 欧美淫片网站| 三级免费网站| 三级成人在线视频| 久久这里精品| 99精品热视频| 日韩国产激情| 精品久久久免费| 国产日产一区| 99精产国品一二三产品香蕉| 亚洲在线黄色| 337p日本欧洲亚洲大胆鲁鲁| 成人app下载| 精品3atv在线视频| 亚洲v中文字幕| 国模精品一区| 日本韩国在线视频| 精品亚洲国产成人av制服丝袜 | 久久精品毛片| 日本综合在线| 国产精品毛片久久久久久久| 亚洲视频资源| 欧美一区二区三区视频免费播放 | 在线国产日韩| 91网页在线观看| 国产精品无码永久免费888| 国产精品久一| 日韩午夜三级在线| 蜜桃久久av一区| 美女视频在线免费| 同产精品九九九| 亚洲一级淫片| 久久久久国产精品嫩草影院| 91免费在线视频观看| 日韩精品亚洲专区在线观看| 777欧美精品| 日本亚洲最大的色成网站www| 91豆花视频在线播放| 日韩欧美成人区| 亚洲伦理一区| hd国产人妖ts另类视频| 色综合天天综合网国产成人综合天| 亚洲欧洲中文字幕| 麻豆传媒视频在线| 精品久久久久久中文字幕大豆网| 亚洲高清资源在线观看| 中文字幕在线视频区| 一区二区三区四区视频精品免费| 波多野结衣在线播放一区| 黄色片免费在线| 亚洲国产毛片aaaaa无费看| 欧美日韩三区| 成人影院av|